Q. The wiring of each mobile home shall be subjected to a ____ minute, ____ volt dielectric strength test (with all switches closed) between live parts (including neutral) and the mobile home ground.
Just in case you think Code Challenge hasn’t been, well, challenging enough, this month we’ve brought a new contributor into the fold to test your knowledge of the NEC. As the owner and president of ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果